1 / 5










Payment Method: Generally TT (wire transfer), 30% deposit, and the remaining 70% paid before shipment.
Foundation Requirements: If the land is stable, no complex foundation is needed. We provide complete foundation drawings and video instructions for installation.
Quality Assurance: Every production step is checked by quality inspectors using vernier calipers for thickness measurement. Pre-packing inspection of paint surfaces and spare parts inclusion are standard protocols.
Additional Equipment: Semi-Automatic PET Bottle Blowing Machine for plastic container production.